
The documents and the order of steps for the building use permit, in brief.
The occupancy permit shows the building was completed according to its design, and opens the way to utility connections.
Before applying
The building inspection firm’s completion report and all required signatures must be in place.
Applying
After the application to the municipality, an on-site inspection follows.
This post is sample content.

