
From the risky-building assessment to the land-for-flats contract, we walk through the process step by step.
Managed well, urban renewal is a safe and valuable new start for property owners. In this post we summarize the main steps.
1. Risky building assessment
The process starts with an assessment by a licensed institution.
2. Agreement and contract
A transparent discussion with the owners leads to a notarized contract.
3. Demolition and the new building
After demolition and excavation, a new building is built to the current code.
This post is sample content.

